Barrier Pyramid PZ-1 (Concrete Tetrahedron)

The PZ-1 barrier pyramid is a reinforced concrete tetrahedron (a concrete “dragon’s tooth”) for continuous lines of anti-tank obstacles against wheeled and tracked vehicles. Heavy B25-class concrete, a through steel lifting loop, installation of the anti-tank obstacles in one or several rows without anchoring to the base. Manufacturing and delivery across Ukraine.
Purpose
A reinforced-concrete tetrahedron (a pyramid with a triangular base) is a single-use anti-tank barrier. It is produced by vibro-casting in steel moulds. It is intended to form continuous lines of barriers against wheeled and tracked vehicles.
Material and construction
It is made of heavy concrete of class B25 (M350). The material has a compressive strength of 25 MPa, frost resistance F200 (withstands 200 freeze-thaw cycles) and water resistance W6. A through lifting loop made of STZSP steel reinforcement of class A240, 10 mm in diameter and 980 mm long, passes through the entire product and is used for crane slinging during transport and installation.
When armoured vehicles drive over it, the tetrahedron's vertices dig into the ground, including frozen ground, holding the product against displacement. They are installed in one or several rows without fixing to the base; for additional fixation, rows can be linked together with chains.
Frequently asked questions
It is a reinforced concrete tetrahedron (a concrete “dragon’s tooth”) — an anti-tank obstacle against wheeled and tracked vehicles.
Heavy B25-class concrete, with a through steel lifting loop.
In continuous lines — in one or several rows, without anchoring to the base.
Yes, the certificate of conformity is attached on the page.
