Laying Road Slabs: Base Preparation and Installation

How to lay road slabs correctly: preparing the sand-and-gravel base, crane installation, joints and connections. The base determines the durability of the precast surface.

A precast surface made of road slabs is ready for traffic right after laying. But the durability of the surface depends on a properly prepared base and the installation technology — this is where the service life of the road or yard is set.

Base preparation

  • Remove the topsoil, level and compact the ground.
  • Lay a sand or sand-and-gravel bed and compact it.
  • Maintain the design slopes for water drainage.

Laying the slabs

  1. The slabs are placed with a crane on the prepared base.
  2. They are levelled and checked for tight contact with the base.
  3. The layout is followed with bonding of the joints.

Joints and connections

Installation joints are left between the slabs and, if required, filled or grouted. The lifting loops are cut off or bent flush with the surface. When the surface must work together under load, the slabs are connected by welding at the embedded parts.

Advantages of a precast surface

  • The driveway is ready at once — no waiting for curing.
  • Individual slabs can be replaced during repairs.
  • After dismantling, the slabs are reused.

We will select the road-slab size for the load and the base and arrange delivery — contact PVK Arsenal.