
Buildings from Block-Modules: Construction Stages
How a building from reinforced-concrete block-modules is built: from manufacturing the volumetric sections at the plant to crane installation and utility connection. Faster than building on site.
A building from construction block-modules is assembled from ready-made volumetric reinforced-concrete sections. Most of the work is done at the plant, and on site the modules are joined into a finished building — this noticeably shortens the schedule compared with building on site.
Construction stages
- Engineering calculation and manufacturing of the volumetric sections at the plant.
- Foundation preparation for the module layout.
- Delivery of the sections to the site by special transport.
- Crane installation of the modules and joining them together.
- Sealing the joints, connecting utilities and finishing.
What modular technology gives
- Speed — the building shell goes up in days, not months.
- Factory quality of concrete and section geometry.
- Less dependence on weather on site.
- Durability and strength of reinforced concrete.
What to consider
- Section dimensions and weight — transport and crane are chosen for them.
- Foundation type for the project and soil.
- Access and space for crane work on the plot.
- The utility-connection scheme.
We will design a block-module building for your task, manufacture the sections and arrange delivery and installation — PVK Arsenal.



